AKA Studio turns your past trials, formulations, sensory panels, and lab results into the starting point for every new product decision.
Bring us the project your team is stuck on. We'll work it with you in Studio, then prove it on your own data.

AKA Studio project overview, shown with a demo project.
Not a tool you open now and then. AKA Studio is where your R&D data lives, every day.
Formulations, trials, sensory results and the decisions behind them, in one structured record your team works in daily.
Production specs, inventory and finance stay in your ERP and PLM. Studio holds the R&D record and connects to them.
A chatbot answers questions and forgets. Studio holds and structures your company's own history, so every answer has a source.
The answer to your next project is often sitting in an old trial, a past sensory panel, a supplier spec, or a senior scientist's notebook. It's spread across spreadsheets, shared drives, and systems that don't talk to each other.
So teams rerun trials and rebuild recipes someone already made. Sensory and lab results sit apart, so nobody can link a change in the recipe to a change in how consumers liked it.
AI is only as good as the data it reads. That's where we start.
Example answers from a demo project.
Your company's data and the outside world are organized into one company memory. A new project starts there, the real work still happens in your lab, and every result goes back in for the next one.
From a real project: a plant-based milk went from 7 iterations to 3.
TDC · SPECIALTY INGREDIENTS, SOUTH AFRICA
“The ability to see and use all of our knowledge in one place.”Chris Botha, R&D Director, TDC17 users across Johannesburg and Cape Town. Time savings as reported by TDC's development team. Read the TDC case study →
The same company memory, shaped around how your business develops products.
The same flow our customers use on real projects.
Studio brings your past trials, formulations, sensory panels, and lab results into one private place. Ask a question and get the answer from your own data, with the source attached.
Studio works from your brief and your limits: cost, nutrition, regulation, and the ingredients you can actually buy. It suggests candidate recipes inside those limits and recalculates cost and nutrition on every edit. You decide what to run.
Tasting results and lab data stay tied to the recipe that made them, including the failed trials and rejected panels. When a project changes hands, the knowledge stays. The next team starts where the last one stopped.
Start with one challenge your team faces this quarter. We prove it on your own data, then grow from there.
A new rule means reformulating fast. See every affected recipe, its ingredients and its test history in one place, and start the new version from what you already know.
Find what you used before, what worked, and swaps that stay inside your cost, nutrition and label limits, with cost and nutrition recalculated on every edit.
Several prototypes, one panel, and nobody's sure why the product wasn't amazing. Line up each prototype's tasting results with its recipe and see what changed.
A customer sends a new brief. Start from your closest past formulation or application and its test results, so the first sample is already close.
Find the recipe version, the supplier spec and the panel results behind a product in one place, so you can see what changed.
R&D, quality, procurement and sales each work in their own system. Map how data flows between them, then connect it into one record every team works from.
See AKA Omni →Get your data organized first, or work with our food technologists in our own labs.
Tell us the project your team is stuck on. We'll show you how Studio starts it from what you already know.
Build clean, compliant food labels in minutes. We made it free because tooling cost shouldn't decide who gets to bring a product to market.
Open Label Studio free →